Score tasks with weighted criteria, calculate real working capacity for any date range, and auto-schedule work around deadlines, dependencies and locked calendar blocks.
The planner separates two questions: which task matters most, and what actually fits in your calendar. Priority scores come from a weighted multi-criteria model (impact, strategic alignment, urgency, deadline risk, effort and any custom criteria). Capacity comes from your own working schedule for the dates you choose: hours per weekday, breaks, holidays, date overrides, a maximum daily workload and a safety buffer. The scheduler then places tasks into free working time by priority, pulls deadline-critical tasks forward, waits for dependencies to finish, respects minimum session length and no-split rules, and never moves blocks you have locked.
Total Available Hours = SUM(available working hours on each date in the planning period)
Usable Capacity = Total Available Hours × (1 − Buffer % / 100)
Capacity Utilization = Scheduled Task Hours / Usable Capacity × 100
Priority Score = 100 × Σ (weight_i × normalized_value_i) / Σ weight_i
Rating criteria: (rating − 1) / 4 · Cost criteria (e.g. effort): 1 − normalized value
Urgency = 1 − days until deadline / urgency window · Deadline risk = remaining hours / usable hours before the deadline
Use it for weekly or sprint planning, when a deadline-heavy month needs a realistic plan, when you work different hours on different days, before committing to a client delivery date, or whenever a to-do list is longer than the time available and you need to decide what moves, what waits and what will not fit.
A consultant works Monday 6h, Tuesday 4h, Wednesday 8h, Thursday 5h and Friday 6h (29 hours a week). For a 14-day period the total available time is 58 hours. With a 15% buffer the usable capacity is 58 × 0.85 = 49.3 hours. If 42 hours of tasks are scheduled, capacity utilization is 42 / 49.3 × 100 = 85.2%, leaving 7.3 hours of slack for unplanned work.
To build a realistic plan, choose any planning period, describe when you can work, score your tasks, and let the scheduler fit the highest-priority work into the hours you actually have.
Weighted scoring generalizes the most common prioritization frameworks. The presets in this planner reproduce their intent with adjustable weights.
| Method | What it ranks by | Best for | Limitation |
|---|---|---|---|
| Weighted scoring (this tool) | Any criteria you choose, each with a weight | Teams and individuals who want transparent, adjustable priorities | Needs honest ratings to be meaningful |
| Eisenhower matrix | Urgent vs. important (four quadrants) | Quick personal triage | No effort, capacity or dependency awareness |
| RICE | Reach × Impact × Confidence / Effort | Product feature backlogs | Ignores deadlines and available time |
| WSJF (SAFe) | Cost of delay / job duration | Agile portfolio sequencing | Requires relative estimates across all items |
| MoSCoW | Must, Should, Could, Won't categories | Scope negotiation for a release | No ranking inside a category |