Advanced Distribution Management Systems (ADSM) for more efficient and flexible distribution grids (Call #50129862)
Project results are expected to contribute to all the following expected outcomes: Enhanced reliability, resilience, controllability and efficiency of electricity distribution grids. Congestion in distribution grids is managed effectively; Distribution system operators (DSO) l...
Grant Key Specifications
| Call Reference ID | 50129862 (50129862TOPICSen) |
|---|---|
| Funding Program | Horizon Europe (SEDIA) (HORIZON Innovation Actions) |
| Funding Budget / Grant Size | €9.500.000 |
| Submission Deadline | Dec 1, 2027 |
| Eligible Beneficiaries | SMEs & Startups |
| Target Domains | Horizon Europe / EU Programmes, Climate, Energy & Mobility, Circular Economy & Green Transition, HORIZON Innovation Actions |
| Key Technologies | Digital Technologies, Artificial Intelligence (AI) |
| Official Call Portal | View Official Call Notice → |
Expected Outcomes, Scope & Call Description
Expected Outcome & Scope Expected Outcome: Project results are expected to contribute to all the following expected outcomes: Enhanced reliability, resilience, controllability and efficiency of electricity distribution grids. Congestion in distribution grids is managed effectively; Distribution system operators (DSO) leverage modern digital solutions and employ improved systems to effectively manage their grids and improve interoperability with TSOs and other DSOs; Vendor-agnostic reference architectures, solutions and tools are developed to help advancing the ADSM design and operation and effectively manage a broad range of grid services. Scope: Projects are expected to address all the following items: Design and test innovative solutions, architectures, technologies and processes for advancing the way the ADSM are designed and operated; Provide ADSM software platforms that improve grid performance, controllability, and help integrating distributed energy resources (DERs) in an efficient way, while reducing congestion and improving grid flexibility; Advance forecasting solutions for energy supply, demand, and flexibility made available to the system operator; provide advanced analytics and visualisations; Advance interoperability, both with TSOs and other DSOs, as well as with the DERs at the edge of the grid; Leverage modern solutions, notably digital twins and artificial intelligence. Use security-by-design and advanced protection mechanisms against cyber threats. Use and/or develop, to the greatest extent possible, open-source software solutions and or software modules; Develop a manual and propose best practices on this matter to be used by other DSOs (including instructions to operate the system). Identify remaining gaps and further needs for research and development. The demonstration, test and validation of the activities should be carried out in at least two pilots in different EU Member States or Associated Countries. Projects are expected to include at least three Distribution System Operators (DSOs) and at least two universities and/or research organisations. Additionally, collaboration is encouraged with the following entities: at least one supplier of technology and solutions for ADMS; at least one transmission system operator, which manage grids that are connected to the grids operated by any of the DSOs that are partners in the project; (at least) one project funded under the separate call ‘Advanced TSO control rooms to enhance grid control and resilience’ with the view to strengthen TSO-DSO coordination and support interoperable solutions. To that end, the project proposals are expected to describe a credible mechanism to do so. This collaboration (minimum number of entities) is sought per project in total and does not necessarily apply per each pilot in particular. Selected projects are expected to contribute to the BRIDGE initiative [1] and actively participate in its activities. null Activities are expected to achieve TRL 6-8 by the end of the project – see General Annex B. Activities may start at any TRL. [1] https://bridge-smart-grid-storage-systems-digital-projects.ec.europa.eu/
Frequently Asked Questions: Advanced Distribution Management Systems (ADSM) for more efficient and flexible distribution grids
- What is the grant budget and funding instrument for "Advanced Distribution Management Systems (ADSM) for more efficient and flexible distribution grids" (Call #50129862)?
- "Advanced Distribution Management Systems (ADSM) for more efficient and flexible distribution grids" (Call Reference: 50129862) is published under Horizon Europe (European Commission SEDIA) as a HORIZON Innovation Actions. The indicative funding allocation is €9.500.000. Funding is provided as non-dilutive, equity-free European grant support subject to the call's grant agreement terms.
- Who is eligible to apply for "Advanced Distribution Management Systems (ADSM) for more efficient and flexible distribution grids"?
- Eligible applicant categories for this call include: SMEs & Startups. Applicants must be legally established in an eligible European Union Member State or Horizon Europe Associated Country and meet the specific consortium or single-beneficiary admissibility rules detailed on the official submission portal.
- When is the submission deadline for "Advanced Distribution Management Systems (ADSM) for more efficient and flexible distribution grids" and how do I apply?
- The official submission deadline for "Advanced Distribution Management Systems (ADSM) for more efficient and flexible distribution grids" is 2027-12-01T00:00:00.000+0000. Proposals must be submitted electronically before the cutoff time via the official European Commission Funding & Tenders Portal (SEDIA) linked in the Grant Key Specifications table above.
- What are the core objectives and scope of "Advanced Distribution Management Systems (ADSM) for more efficient and flexible distribution grids"?
- This call targets Horizon Europe / EU Programmes, Climate, Energy & Mobility, Circular Economy & Green Transition, HORIZON Innovation Actions. Specifically: Project results are expected to contribute to all the following expected outcomes: Enhanced reliability, resilience, controllability and efficiency of electricity distribution grids. Congestion in distribution grids is managed effectively; Distribution system operators (DSO) l...
Prepare Your EU Proposal
Verify your project's expected maturity with our free TRL Calculator (Horizon Europe TRL 1–9), calculate work-package study power with the Sample Size Calculator, or browse all open EU & Cascade Funding Opportunities →
Related Open EU & Cascade Funding Calls
- Neutral-Atom Platform Technologies (Deadline: 2026-11-17 · €20.000.000)
- Quantum Experimental Pilot Lines for Quantum Technologies (Deadline: 2026-11-17 · €15.000.000)
- Next-Generation QKD Systems (Deadline: 2026-11-17 · €24.000.000)
- Quantum-Testing Infrastructure for Quantum Technologies (Deadline: 2026-11-17 · €20.000.000)
- Trapped-Ion Platform Technologies (Deadline: 2026-11-17 · €20.000.000)
- Superconducting Platform Technologies (Deadline: 2026-11-17 · €20.000.000)
- Driving Urban Transitions (DUT) Call 2026 (Deadline: 2026-11-17 · €80.000.000)
- UPRAISE specialized learning activity/selfstanding module in the Public Administration area: “Digital Transformation, Artificial Intelligence and Virtual Worlds for Public Administration” at UNINA (Deadline: 2026-11-18 · €20.000)